Skip to content
Klang IndustrialMs Teh Seok Hoon, PEA 4006

Running a factory or warehouse 24 hours in Klang: permissible noise levels at night, loading and shift rules

Ms Teh Seok Hoon, PEA 4006. Updated

No Klang rule we found closes factories at night. MBDK's industrial licence conditions set no operating hours, but they forbid noise, dust or smell that becomes a nuisance and require work to stay inside the premises. The DOE's recommended night limit (10pm to 7am) at existing housing is 55 to 60 dBA, against 75 dBA inside industrial zones. Shift workers may average 45 hours a week over three weeks, never more than 12 hours a day.

Key takeaways

  • Hours are not the limit, nuisance is: MBDK's conditions for factory and warehouse licences have no closing time, but they ban noise nuisance and industrial work outside the premises.
  • Night means 10pm to 7am in the DOE guideline. Next to existing suburban or urban housing the recommended night level is 60 dBA; inside an industrial zone it is 75 dBA.
  • Night loading is allowed on your own lot, but lorries may not park on main roads or in housing areas: MBDK tows them, with a RM1,000 fine plus RM3,000 for the tow (Sin Chew, Oct 2025).
  • Shift workers can work more than 8 hours a day if the average stays within 45 hours a week over three weeks and no day goes past 12 hours.
  • Before signing, visit after 10pm, find the nearest houses, ask for the previous licence and any council notices, and write 24-hour use into the tenancy.
Warehouse loading area with dock doors
Warehouse loading area with dock doors · Illustrative image
Night period (DOE guideline)
10pm to 7am
Night limit at existing suburban or urban housing
60 dBA (LAeq)
Night limit in an existing industrial zone
75 dBA (LAeq)
Shift work (Employment Act s.60C)
45 hours a week averaged over 3 weeks, at most 12 hours a day
Overtime cap
104 hours a month

Where a factory can run through the night

None of the rules this guide draws on sets a closing time for a factory or warehouse in Klang. Whether a unit can run around the clock depends on its land use, its approved building use, the licence for the activity and how close the nearest homes are. In Kapar, Meru, Port Klang and the older estates around Klang town, the licensing council is Majlis Bandaraya Diraja Klang (MBDK). Bukit Raja Selatan near i-City is under the Shah Alam council and Puncak Alam is under the Kuala Selangor council, so read that council's conditions instead.

MBDK's compliance conditions for industrial licences, which cover factories, warehouses and used goods (barangan lusuh) premises, have no operating hours. They do set the limits that matter at night: industrial activity must be carried out inside the premises only; the licensee must not make or cause noise that becomes a nuisance; dust, vapour, heat, gas, smell, vibration, smoke and soot that become a nuisance are also forbidden; no industrial goods or obstructions may be placed outside the premises, on the five-foot way, in car parks or other public areas without the council's permission; and an industrial premises may not be used as private lodging. Breaches can be enforced under the Local Government Act 1976, the Town and Country Planning Act 1976, the Street, Drainage and Building Act 1974 and the council's 2007 licensing by-laws.

So the practical answer is where the unit sits inside the estate. A unit deep in a gazetted industrial area, with factories on every side, is judged against industrial neighbours. A unit on the edge of an estate, facing a taman, a kampung, a school or a surau, is judged against the quietest neighbour. The buffer distances between industry classes and homes are the planning side of the same question.

DOE night noise limits by land use

The Department of Environment (DOE, Jabatan Alam Sekitar) sets recommended limits in its Guidelines for Environmental Noise Limits and Control, third edition (2019). Day is 7am to 10pm and night is 10pm to 7am. The level is the equivalent continuous sound level (LAeq) over the period, measured outdoors at the property boundary of the receiver, usually the nearest homes. For an industrial source in an industrial zone, the assessment may be made at the boundary of the plant itself.

For existing built up areas, which covers almost every Klang estate, the guideline's Second Schedule recommends these levels:

For new development the First Schedule is stricter: at night 50 dBA for low density housing, 55 dBA for suburban housing, 60 dBA for urban housing and commercial zones, and 65 dBA for industrial zones. Where the existing night noise is already above these figures, the Third Schedule asks that it be kept at the existing level, with up to 1.5 dBA more treated as no change.

These are guideline figures. Section 23 of the Environmental Quality Act 1974 forbids noise emitted in contravention of acceptable conditions, and the guideline says its limits can be made mandatory through the legal powers of the DOE and local authorities, and through the approval conditions of projects that needed an Environmental Impact Assessment. Its annex on community annoyance, taken from BS 4142, says a noise around 10 dB above the background makes complaints likely, and adds 5 dB for a tone such as a whine and 5 dB for impulsive sound. Background noise drops at night, which is why a compressor or a press that nobody notices at noon can bring complaints at 2am.

  • Low density housing and noise sensitive places (schools, hospitals, places of worship): 55 dBA at night, 60 dBA by day
  • Suburban and urban housing and mixed development: 60 dBA at night, 65 dBA by day
  • Commercial zones: 65 dBA at night, 70 dBA by day
  • Industrial zones: 75 dBA at night and by day

Loading and container trucks at night

Nothing in MBDK's conditions bans loading at night, and the port side runs around the clock. Westports describes its port as operating 24/7 in its 2024 sustainability report, and its 2026 tariff counts free storage for import containers in hours: 96 hours for non ASEAN cargo and 120 hours for ASEAN cargo, from the time the container is received to the time it leaves the yard. Container moves are not tied to office hours.

The limits are on where the trucks wait and how much noise reaches the neighbours. Loading has to happen inside your lot, because goods and obstructions outside the premises need the council's permission. Heavy vehicles may not park in housing areas or on main roads: a Klang councillor told Sin Chew in October 2025 that MBDK fines an offending heavy vehicle RM1,000, charges RM3,000 for the crane and tow, RM200 in administration and RM100 a day in its pound, and that 102 heavy vehicles had been towed or seized from January to August 2025.

For a 24-hour warehouse that means enough room inside the gate for trucks that arrive early, and a loading bay that does not face the nearest houses. Engines, forklifts and loading noise count toward the same boundary level as the machines inside. Our guide on container truck access and loading bays covers the turning and queuing space to measure.

Shift work under the Employment Act

The Employment Act 1955 (official reprint as at 1 August 2023) caps normal hours at 8 a day and 45 a week, with a break of at least 30 minutes after 5 consecutive hours (section 60A). Section 60C lets an employer require a shift worker to work more than 8 hours a day or 45 hours a week, as long as the average over any three weeks, or a longer period the Director General approves, does not exceed 45 hours a week. No shift worker may be required to work more than 12 hours in one day, except for an accident, work essential to the life of the community, defence or security, urgent work to machinery or plant, or an interruption that could not be foreseen.

The Act itself sets no rate for a night or shift allowance; section 60C(2A) lets the Minister make regulations on it, so check what applies and write the allowance into contracts. Night shifts also need beds that are not in the factory, because MBDK's conditions forbid using industrial premises as private lodging. Our guide on hiring factory workers and CLQ housing in Klang covers that.

  • Rest day: for a shift worker, any continuous period of at least 30 hours counts as the weekly rest day, and the rest day roster must be prepared before the month starts (section 59).
  • Overtime: paid at no less than one and a half times the hourly rate (section 60A(3)), and capped at 104 hours a month by the Employment (Limitation of Overtime Work) Regulations 1980 (The Edge, Dec 2018).
  • Women on night shifts: Part VIII of the Act, Employment of Women (sections 34 to 36), is marked deleted by the Employment (Amendment) Act 2022 (Act A1651), so the current reprint has no separate night work rule for women.
  • Higher earners: for employees earning more than RM4,000 a month, the overtime pay rule and section 60C(2A) on shift allowance regulations do not apply, unless they fall in the First Schedule groups such as manual workers, drivers and their supervisors.

Noise inside the plant on a 12-hour shift

Neighbours are one limit; the workers' own hearing is another. The Occupational Safety and Health (Noise Exposure) Regulations 2019 replaced the 1989 factory regulations from 1 June 2019. DOSH defines excessive noise as a daily exposure above 82 dB(A), a daily dose above 50 percent, a maximum level above 115 dB(A) at any time or a peak above 140 dB(C).

The daily figures assume an 8-hour day, which matters when shifts run 12 hours. In DOSH's Industry Code of Practice for occupational noise exposure and hearing conservation (2019), the daily exposure duration limit is 8 hours at 85 dB(A), 10 hours 5 minutes at 84 dB(A) and 12 hours 42 minutes at 83 dB(A). A line that is within limits on an 8-hour shift can be over them on a 12-hour one.

DOSH's deputy director general for occupational health told The Star in April 2025 that noise-related hearing disorders made up 81 percent of 31,488 occupational disease cases reported from 2019 to 2023, that almost 80 percent of the 2023 cases were in manufacturing, and that an employer who fails to carry out noise risk assessments or provide hearing protection and audiometric tests can be fined up to RM10,000, jailed up to a year, or both.

What night complaints look like in Klang

Council action in Klang usually starts with residents. In September 2025, The Star reported that residents near an aluminium ingot plant in Sungai Kapar Indah had repeatedly complained about dust and smoke, especially at night. MBDK inspected the plant with the Selangor DOE, which issued a notice under the Environmental Quality (Clean Air) Regulations 2014, and the council issued three compounds totalling RM3,000: for cleanliness, for smoke and dust, and for operating without a valid licence, because the plant used two lots and only one was licensed.

In December 2025 The Star reported compounds on two aluminium ingot plants, in Klang Sentral Industrial Park and Sungai Kapar Indah, after complaints about smoke and smell, particularly in the late evenings; one of them also paid RM250 under the Street, Drainage and Building Act for storing items outside its premises. Noise alone can turn into a long dispute: in 2019 The Star reported residents of Kampung Batu Belah, off Jalan Haji Sirat, enduring hammering and grinding from metal workshops across from their homes for six years, from 8.30am to 10.30pm.

Three lessons for a 24-hour operator: every lot you use needs its licence, goods stay inside, and the first complaint usually comes during the hours when the neighbourhood is trying to sleep. For the estates themselves, see the Kapar and Sungai Kapar Indah industrial area data on FactoryHub.

How to check a unit before you sign

Most of these checks cost nothing and are easiest before the tenancy or the sale and purchase agreement is signed:

Units with clear specifications are easier to compare, such as this 127,000 sq ft warehouse in Pekan Meru. Ms Teh can help you find factories and warehouses in Kapar, Meru and Port Klang where a round the clock operation fits the estate.

  • Confirm the council and the approved use: the land title's category and conditions, the building approval and the certificate of completion and compliance (CCC), and that the activity you will license fits them. Our guide to what MBDK checks for an industrial licence lists the documents.
  • Visit after 10pm. Note the nearest houses, schools and places of worship, which side of the unit faces them, and how loud the estate already is at night.
  • Ask the owner for the previous occupier's licence, for any council notices or compounds on the lot, and whether any approval for the building or the estate carries noise conditions.
  • Look at where trucks will queue: inside the gate, not on the road. Measure the distance from the loading bay to the nearest homes.
  • Write it into the agreement: permitted use, 24-hour operation, the loading area, and the landlord's consent for acoustic enclosures, silencers or barriers if they are needed later.
  • Check the power tariff. Under TNB's revised Time of Use scheme for low voltage users, peak hours are 2pm to 10pm on weekdays and off-peak runs from 10pm to 2pm the next day and all weekend (Bernama via TNB, Jul 2025). Ask TNB which tariff the unit's meter is on, and size the load with the factory power calculator (FactoryHub).

Questions buyers and tenants ask

Do I need permission from MBDK to run my factory 24 hours?

Not as a separate permit in the conditions we read. MBDK's industrial licence conditions for factories, warehouses and used goods premises set no operating hours. Your licence must cover the activity and every lot you use, and the conditions forbid noise, dust, smoke or smell that becomes a nuisance. If neighbours complain at night, the council can inspect and compound the premises, as it did in Sungai Kapar Indah in 2025.

Can loading and unloading go on 24 hours at a warehouse in Klang?

Yes, inside your own lot. MBDK's conditions do not limit loading hours, and Westports runs 24/7. Trucks must wait inside the gate: MBDK tows heavy vehicles parked on main roads or in housing areas, with a RM1,000 fine plus RM3,000 for the tow. Keep forklifts and trucks away from the side facing houses, because their noise counts toward the night limit at the neighbours' boundary.

What are the noise limits for factories at night?

The DOE guideline recommends, for existing built up areas between 10pm and 7am, 55 dBA at low density housing and sensitive places such as schools, 60 dBA at suburban and urban housing, 65 dBA at commercial zones and 75 dBA in industrial zones, measured at the receiver's boundary. New developments use lower figures, from 50 to 65 dBA.

What is the action level for noise in Malaysia?

For workers, DOSH treats a daily exposure above 82 dB(A), a daily dose above 50 percent, any level above 115 dB(A) or a peak above 140 dB(C) as excessive noise under the Noise Exposure Regulations 2019. The 85 dB(A) figure is set for 8 hours; DOSH's code of practice allows only 12 hours 42 minutes at 83 dB(A).

Is JAS the same as the DOE, and is MBDK the same council as MPK?

Yes. Jabatan Alam Sekitar (JAS) is the Malay name of the Department of Environment (DOE), which publishes the noise guideline. Majlis Bandaraya Diraja Klang (MBDK) is the Klang council that was earlier Majlis Perbandaran Klang (MPK), and its industrial licence conditions still cite by-laws made under the old name, such as the 2007 licensing by-laws.

How many hours can a shift worker work in one day in Malaysia?

Up to 12 hours, and only while the average over three weeks stays within 45 hours a week (section 60C of the Employment Act 1955). Longer days are allowed only for an accident, work essential to the community, defence, urgent work on machinery or plant, or an interruption that could not be foreseen. A busy order book is not on that list.

Units in these places

Tell Ms Teh what you need

Send the size, power, ceiling height, budget and move-in date you need on WhatsApp, or call her directly.

WhatsApp Ms TehCall