Choosing a metal fabrication factory in Klang: industry class, power, crane, floor and noise

Ms Teh Seok Hoon, PEA 4006. Updated

Check the industry class before the building. In the Department of Environment's 2012 siting list, machining, welding, laser cutting and structural steel work are medium industry, while stamping, forging and metal casting are heavy. Selangor approved metal plants from 2022 to 2024 in Kapar, Meru, Bukit Raja, Pulau Indah, the Port Klang side and Puncak Alam. Then check TNB supply, crane beams, the floor design, noise and scheduled waste.

Key takeaways

  • The DOE's 2012 siting list puts machining, welding and structural steel work in category 3 (medium) and stamping, forging and casting in category 2 (heavy).
  • A lot limited to light industry rarely suits production metal work: light industry should produce no scheduled waste, and spent soluble coolant is scheduled waste SW 307.
  • Selangor approved metal projects from 2022 to 2024 in Kapar, Meru, Bukit Raja, Pulau Indah, Bandar Sultan Suleiman, Pandamaran and Taman Industri Alam Jaya; Telok Gong has allowed no new heavy industry since September 2021.
  • TNB requires a new substation above 350 kVA, and welding and press loads must stay within its voltage step, flicker and harmonic limits.
  • In JPPH-registered deals to August 2026, RM5 million is the median semi-D factory price in Klang and Port Klang.
Factory hall with an overhead crane
Factory hall with an overhead crane · Illustrative image
Stamping, forging, casting (DOE 2012 list)
Category 2, heavy industry
Machining, welding, structural steel (DOE 2012 list)
Category 3, medium industry
Excessive noise for workers (DOSH)
Daily exposure above 82 dB(A)
Spent soluble coolant
Scheduled waste SW 307
Median semi-D, Klang and Port Klang (JPPH, 24 months to Aug 2026)
RM5 million

Light, medium or heavy: where your metal process falls

For a metal shop the first check is the industry class the lot allows, because it decides how far the plant must sit from homes and whether the council will license your process. The Department of Environment (DOE) guides siting through its Guidelines for the Siting and Zoning of Industry and Residential Areas (2012) and its Environmental Essentials for the Siting of Industries in Malaysia (2017). A site is judged against the gazetted local plan, the land use around it, the buffer zones set by PLANMalaysia and the area's capacity to take more pollution (MIDA). Ms Teh's page on light, medium and heavy industry explains the classes and buffers.

Appendix B of the 2012 guideline, its second revised edition, lists each activity by MSIC 2008 code with a category and an overall and a primary buffer in metres. Metal work does not sit in one class:

Can a light-industry lot take metal work? For production machining or fabrication, rarely. The DOE's guide for investors describes light industry as making no excessive noise, having no stacks or chimneys, using no toxic or hazardous raw materials and producing no scheduled wastes (DOE). Spent soluble coolant from a CNC shop, a mineral oil and water emulsion, falls under scheduled waste code SW 307, and fabrication shops weld and grind through the shift. The class is not printed on the land title: it comes through the title's express conditions and the local plan zoning, so ask to see both. Of the units on Ms Teh's list with a recorded class, 19 are light industry, 14 of them in Puncak Alam.

  • Machining and treatment of metals, MSIC 2592 (turning, milling, boring, grinding, welding, laser cutting, heat treatment, sandblasting, plating and anodising): category 3, medium, 250 m overall and 200 m primary.
  • Structural metal products, MSIC 2511 (frames, trusses, metal doors, gates and partitions), and tanks and containers: category 3, medium, 250 m and 200 m.
  • Parts and accessories for motor vehicles, MSIC 2930 (brakes, axles, exhausts, bumpers, seats): category 3, medium, 250 m and 200 m.
  • Forging, pressing, stamping and roll-forming of metal, and powder metallurgy, MSIC 2591: category 2, heavy, 350 m and 300 m.
  • Casting of iron, steel and non-ferrous metals, including die-casting, MSIC 2431 and 2432: category 2, heavy, 500 m and 350 m.
  • Basic iron and steel making, MSIC 2410 (blast furnaces, steel converters, casting lines): category 2, heavy, 600 m and 500 m.

Where metal plants were approved in Klang from 2022 to 2024

Selangor's list of manufacturing projects approved from 2022 to 2024, tabled in the State Assembly in 2025 (Dewan Negeri Selangor), shows where metal work has been approved in Ms Teh's areas. An approval covers one company's project, not the lot next door, but it shows what each estate has accepted:

Two places need a closer look. In Telok Gong, the Klang council's master plan in force since 1 September 2021 allows only light and medium industry, so a new stamping, forging or casting line, all heavy in the DOE list, should not be planned there, even though older heavy plants remain. Pulau Indah Industrial Park's phase 1 is mostly occupied by heavy industries (NST, 2020), which makes the island a first search for a press shop or a foundry. Ms Teh's 106,000 sq ft factory in Pulau Indah is recorded as heavy industry, with 2,000 A, a 4 t/m² floor, a 40 ft apex and 8 loading bays.

  • Kapar: fabricated metal products at Batu 6 Kapar (2022), steel handrails, ladders and platforms in Sungai Kapar Indah (2023), cylinder head covers for cars and air compressors in the Sungai Kapar Indah high-tech area (2022), actuated valves in Kapar Indah (2024), and secondary aluminium ingots at Sungai Puloh off Jalan Kapar (2023).
  • Meru: fabricated metal structures on Jalan Haji Sirat (2022), aluminium ladders in Kawasan Perindustrian Meru Timur (2024) and frames for automated guided vehicles off Jalan Meru (2024).
  • Bukit Raja: structural steel sections, iron poles and metal furniture on Jalan Waja in Bukit Raja Industrial Estate (2023), crane parts, racking and hoists in Bandar Bukit Raja (2023 and 2024), and car bumper and instrument panel modules (2023).
  • Pulau Indah: tin smelting, copper rods and wire, aluminium scrap processing and secondary aluminium ingots (2022), and the reconditioning of excavators, loaders and trucks, made-to-order fabricated metal products and steel cases for lithium-ion batteries (2024).
  • Port Klang side: aluminium alloy ingots in Bandar Sultan Suleiman by Northport (2022), moulds and precision machined parts in Sobena Jaya and in Pandamaran (2024), and overhead and gantry cranes in Telok Gong (2023).
  • Puncak Alam: in Taman Industri Alam Jaya, metal closing rings (2022), and metal stamped parts, aluminium casting parts and aluminium panels and louvres (2024).

Power for welding sets, CNC lines and presses

TNB sizes a supply by the maximum demand you declare. Above 100 kVA to 350 kVA it is an underground cable at 400 V from a feeder pillar or a new or existing substation, subject to TNB's study; above 350 kVA to 1,000 kVA it needs a direct cable from a new substation; from 1,000 kVA it is taken at 11 kV or 22 kV through a TNB switching station (TNB). Her guide on kVA, amps and TNB upgrades turns a machine list into amps, and FactoryHub's factory power calculator gives a first number.

Metal shops also need to think about how the load behaves, not only its size. TNB's handbook sets limits at the point of connection: a voltage step of 1% for loads that start or switch often, short term flicker severity of 1.0 at 132 kV and below, and total harmonic voltage distortion of 5% at 400 V or less. The customer declares the equipment's compliance on TNB's power quality declaration form. A shop with many welding sets, induction heaters or large press motors cycling through a shift should have its electrical consultant check these limits before the application goes in.

Precision machining has the opposite worry. TNB says it does not guarantee an uninterrupted supply, that all critical equipment and processes must be immune to voltage sags, and that making voltage sensitive equipment ride through sags is the customer's responsibility. For a CNC line, ask the machine supplier about immunity under IEC 61000-4-11 and IEC 61000-4-34, the standards TNB names, before you choose a unit on its amps alone. On Ms Teh's list, a detached factory in Meru with 6,000 A and a Kapar Bestari factory with 1,200 A, a 40 ft eave and a 3 t/m² floor show the range.

Cranes, floors and height for presses and heavy machinery

Selangor's Uniform Building By-Laws treat machinery as a design load. By-law 68 asks for dynamic effects from machinery, runways and cranes to be allowed for, and for concentrated loads, impact and vibration from installed machinery to be provided for in the design, with an increase in imposed loads of at least 20% or the MS EN 1991-1-1 minimum, whichever is higher. Loads while equipment is installed or moved for servicing must be provided for too (Selangor UBBL). By-law 69 requires crane gantry girders to be designed for vibration, shock from slipping slings, acceleration, braking and the impact of wheel loads.

So a stamping press is never judged on the t/m² figure in a listing. The press maker gives the foundation loads and usually a foundation or pit design; a Professional Engineer checks them against the slab and the ground, and a new foundation in an existing building is structural work that needs plans. Her guide on floor loading shows where the design load is marked on the approved plans.

An overhead crane needs runway beams designed into the building and its own DOSH approval and certificate of fitness; her guide on overhead cranes and goods lifts sets out the steps. For heavy machinery and equipment makers, ask the owner for these before a viewing:

  • The crane capacity the runway beams and columns were designed for, from the structural drawings.
  • Hook height at the unit's eave height, since the crane sits below the roof and the apex figure overstates it.
  • Door width and height for finished machines, and yard space for test runs and for loading low loaders.
  • The slab's design load and any machine pits or isolated foundations already in place.
  • The main switchboard rating and whether the supply can grow without a new substation.

Noise, fumes and scheduled waste: what DOE and DOSH ask

Noise is checked twice. Toward neighbours, the DOE's guide for investors says medium industries' machinery noise should be controlled to no more than 65 dB(A) Leq at the factory boundary, and to 55 dB(A) by day and 45 dB(A) at night at the residential or buffer zone boundary (DOE). Inside, the Occupational Safety and Health (Noise Exposure) Regulations 2019 define excessive noise as a daily exposure above 82 dB(A), a maximum level above 115 dB(A) or a peak above 140 dB(C). Where it exists, the employer must appoint a noise risk assessor registered with DOSH within a month, review the assessment at least every five years, identify noise again when machinery is installed or changed, and test the hearing of employees exposed at the exposure limit every year (DOSH).

Furnaces and fume systems bring in the Clean Air Regulations 2014. An owner or occupier must give the DOE written notification at least 30 days before work that may create a source of emission, before changing plant in a way that materially changes emissions, and before modifying an air pollution control system. Ferrous foundries with 1 tonne or more of molten metal a day, and non-ferrous plants with 2 tonnes or more a day (0.5 tonnes for lead or cadmium), must apply the emission reduction techniques the DOE prescribes, known as BAT (DOE, Clean Air Regulations 2014). Larger works need an Environmental Impact Assessment with public display: steel made from scrap iron at 200 tonnes or more a day, from iron ore at 100 tonnes or more, and primary aluminium or copper smelting of any size (DOE, EIA Order 2015).

Waste is where small shops slip. These codes from the Scheduled Wastes Regulations 2005 come up most in metal work:

New generators must notify the DOE within one month of first producing scheduled waste, and may store it on site for up to 180 days and 20 tonnes unless the DOE agrees in writing to more, in labelled containers with the date the waste was first generated (DOE).

  • SW 307: spent mineral oil and water emulsion, such as used soluble coolant.
  • SW 305 and SW 306: spent lubricating oil and spent hydraulic oil.
  • SW 104: dust, slag, dross or ash containing aluminium, copper, lead, nickel, chromium and other listed metals, excluding slag from iron and steel factories.
  • SW 204 and SW 105: sludges containing metals, and galvanic sludges from plating.
  • SW 410: rags, filters and papers contaminated with scheduled waste.

Exhaust fumes, scheduled waste and hazardous chemicals: the approvals

What approvals do factory exhaust fumes and emissions need?

Under the Clean Air Regulations 2014, the owner or occupier gives the DOE written notice at least 30 days before work that creates a new source of emission or changes an air pollution control system. The system must be designed by a professional engineer, declared to DOE with as-built drawings within 30 days of starting, run under a competent person, and any failure reported within one hour.

Does a factory in Klang need scheduled waste management?

Yes, if it produces any: spent oil, solvents, sludge, contaminated rags and many process residues are scheduled waste. The generator notifies the DOE, stores it on site in labelled containers for up to 180 days and 20 tonnes, and sends it only through licensed contractors. MBDK's licence conditions add that industrial waste leaves through a contractor approved by its Environmental Services Department.

Can a factory in Klang store hazardous chemicals?

Yes, under three sets of conditions. MBDK's licence asks for flammable materials in approved closed containers and chemicals stored apart from food and labelled. Bomba treats a flammable liquid store as a hazardous area with its own approved protection. And the DOE classes a process using hazardous raw materials as at least medium industry, to be sited in a designated industrial estate, so a unit recorded as light industry is the wrong home.

Council licence, enforcement and what RM5 million buys

Most of Ms Teh's areas are under the Klang Royal City Council (MBDK): Kapar, Meru, Bandar Bukit Raja, Port Klang and Pulau Indah. Bukit Raja Selatan, the Seksyen 7 side near i-City, is under the Shah Alam council, and Puncak Alam under Majlis Perbandaran Kuala Selangor. Her guide on the industrial licence in Klang covers what MBDK checks.

Enforcement is active, and metal work has been among the cases. In May 2025 MBDK raided five industrial premises, among them heavy vehicle repair and goods storage operations, on Jalan Tengah Telok Gong and Lebuhraya Pulau Indah and found only one with a valid 2025 industrial licence (MBDK). In February 2026 it issued compounds of RM2,000 to RM4,000 each to four unlicensed premises off Jalan Langat, among them scrap metal processing and engineering works (The Star). Selangor counted 4,170 unlicensed factories in May 2025, naming machinery and aluminium workshops among them, under a legalisation programme that runs from 2024 to 2027 (The Star). Before you sign, ask the owner for the CCC and the industrial licence held by the last occupier.

For buyers, JPPH-registered transactions compiled by FactoryHub set the price level. In Klang and Port Klang the median semi-detached factory sold for RM5 million (172 deals in the 24 months to August 2026), typically RM3.5 million to RM7.58 million, on a median 15,861 sq ft of land, while detached factories typically sold for RM8.65 million to RM19 million (Klang and Port Klang transaction data). In Ijok and Puncak Alam the semi-D median was RM3.3 million (13 deals) and the detached median RM7.5 million (13 deals) (Ijok and Puncak Alam data (FactoryHub)). So RM5 million is a semi-D budget in Klang and Port Klang and above the semi-D median in Puncak Alam, and below the typical detached range in both. Budget separately for power, crane beams and machine foundations, which vary unit by unit.

Ms Teh can shortlist units in Kapar, Meru, Bukit Raja, Pulau Indah and Puncak Alam whose recorded class, power and floor suit your process, and ask owners for the drawings and licence history before a viewing.

Questions buyers and tenants ask

Can I run CNC machining or welding in a factory zoned for light industry?

Usually not for production work. The DOE's 2012 siting list puts machining, welding and laser cutting in category 3, medium industry, with a 250 m overall buffer, and the DOE describes light industry as producing no scheduled waste, while spent soluble coolant is scheduled waste SW 307. A small repair or assembly workshop may be treated differently, so ask MBDK what the lot's zoning and title conditions allow for your exact process.

What floor loading do I need for a stamping press?

There is no single figure. The press maker's foundation loads decide it, and Selangor's building by-laws require impact and vibration from installed machinery to be designed for, with at least a 20% increase in imposed load. Large presses usually sit on their own foundation, checked by a Professional Engineer. Stamping is also category 2, heavy industry, in the DOE's 2012 list, so check the lot's class as well as the slab.

Can I set up a foundry or melt aluminium scrap in Klang?

Only on a lot whose title and zoning allow heavy industry. Casting of iron, steel and non-ferrous metals is category 2 in the DOE's 2012 list, with a 500 m overall buffer. Ferrous foundries melting 1 tonne or more a day, and non-ferrous plants processing 2 tonnes or more a day, must apply the DOE's prescribed emission reduction techniques (BAT) under the Clean Air Regulations 2014. Secondary aluminium ingot plants were approved in Pulau Indah, at Sungai Puloh off Jalan Kapar and in Bandar Sultan Suleiman from 2022 to 2024. New heavy industry is not allowed in Telok Gong.

Is Bandar Sultan Suleiman, beside Pelabuhan Utara (Northport), suitable for steel or aluminium work?

It already has metal plants. Selangor's approvals list shows aluminium alloy ingots there in 2022, metal furniture in 2023, and aluminium deoxidiser and aluminium oxide powder in 2024. Pelabuhan Utara is the Malay name for Northport. Check each lot's class and the distance to the nearest homes before you plan a heavy process.

What does a RM5 million budget buy for a metal works factory in Selangor?

In JPPH-registered deals compiled by FactoryHub, RM5 million is the median semi-detached factory in Klang and Port Klang (172 deals in the 24 months to August 2026), where detached factories typically sold for RM8.65 million to RM19 million. In Ijok and Puncak Alam the semi-D median was RM3.3 million. Budget separately for power, crane beams and foundations, which vary by unit.

What should an automotive parts or heavy machinery maker check in a unit?

Car parts are category 3, medium industry, in the DOE's 2012 list; approvals in Klang include cylinder head covers in Sungai Kapar Indah and bumper and instrument panel modules in Bandar Bukit Raja. For machinery makers, check crane capacity and hook height, door size, yard space for low loaders, the slab design and the main switchboard.