A tenant in Klang may sublet or split a factory only as far as its own tenancy allows, so get the landlord's written consent first, and an owner with a bank loan needs the bank's written consent too. Creating more units than were approved is a material change of use that needs planning permission. Partitions need council approval and sometimes fire-rated walls; Bomba, the insurer and TNB must be told, and each occupier needs its own business licence.

Key takeaways

  • The National Land Code lets a tenant grant a sub-tenancy of up to three years over part of a building, but only within what its own tenancy allows; read the subletting clause and get the landlord's consent in writing.
  • If the factory is charged to a bank, the owner cannot grant any lease or tenancy without the bank's written consent (section 226).
  • Turning one approved unit into two or more is a material change of use under Act 172: it needs planning permission, and the land owner is deemed to have permitted it unless proved otherwise.
  • Partition walls need council approval (MBSA asks for a permit or amendment plan; MBDK alteration plans go in through a consultant in the owner's name), and a wall between factory and storage uses must be a compartment wall.
  • Each occupier needs its own business licence; tell Bomba before a material change, have the insurer endorse the new trade, and meter each part through TNB, because supplying electricity to another person without a licence is an offence.
Factory and warehouse hall
Factory and warehouse hall · Illustrative image
Sub-tenancy without registration
Up to 3 years, whole or part of a building (NLC s223, s228A)
Registered lease of part of a lot
More than 3 years, at most 30 years, Form 15A or 15B with a plan
Development without planning permission
Fine up to RM500,000 or 2 years' jail, plus up to RM5,000 a day (Act 172 s26)
Supplying electricity without a licence
Fine up to RM100,000, plus RM1,000 a day (Act 447 s37(5))

Start with the tenancy, the title and the bank

Subletting questions in Kapar, Meru and Bukit Raja come from two directions. A tenant of a large detached factory needs only part of it and wants another company to share the rent. An owner wants to divide a big unit and let the halves separately. The National Land Code allows both in principle, within limits that start with documents you already hold.

Section 223 lets an owner, a lessee or a tenant grant tenancies or sub-tenancies of up to three years over the whole or any part of the land they hold, and section 228A says a part of the land includes a part of a building. These short tenancies are exempt from registration and may even be made by word of mouth (section 213). But section 225 makes a tenant's power subject to the express and implied terms of its own tenancy, and a tenant can only grant over the land it holds under that tenancy. So the first document is your tenancy agreement: find the clause on assignment, subletting and parting with possession, check its end date, and if consent is required, get it in writing, naming the sub-tenant, the area and the use, before anyone moves in.

Longer arrangements are leases. A lease or sub-lease of more than three years is registered at the land office on Form 15A or 15B; over part of a lot it is capped at 30 years and needs a plan and description of the part (sections 221 and 222). In every registered lease, unless it says otherwise, the Code implies that the lessee will not sublet or part with possession without the lessor's prior written consent, which may not be unreasonably withheld (section 231).

Then read the title. The Selangor land and mines office gives, as its example of a restriction in interest, land that may not be transferred, charged or leased without the State Authority's consent, and section 225 makes every power to lease or let subject to such restrictions. If a registered lease or sub-lease is planned, have your lawyer check the title first; our guide to state consent in Selangor explains that process.

Owners who split a unit to let it to two companies often miss this step. Under section 226 of the Code, where land is subject to a charge, the owner cannot grant any lease, sublease or tenancy without the chargee's consent, and for a tenancy that consent must be in writing, signed by the bank or its authorised agent. Ask the bank before you sign with the second tenant, not after.

Tenants have a related point to check. A tenancy exempt from registration does not bind a later buyer or chargee of the property unless it was endorsed on the title before that dealing (section 213). If your sub-tenant is paying for fit-out, it will want to know whether the head tenancy is protected, and you should know whether the owner's title is charged.

Splitting one unit: which council approves what

Partitioning is not only a private matter between landlord and tenant. The Town and Country Planning Act 1976 declares that any increase in the number of units in a building beyond the number originally approved is a material change in the use of the building. That makes it development, and section 19 bars development without planning permission. Interior works are exempt only if they do not change the use, add floor area or affect drainage, sanitation or soundness. Under section 26 the penalty is a fine of up to RM500,000, up to two years' jail or both, plus up to RM5,000 for each day the offence continues, and the owner of the land is deemed to have permitted the act unless the contrary is proved.

Which council you deal with depends on the address. Factories in Klang, Kapar, Meru, Port Klang and Bandar Bukit Raja answer to MBDK; Bukit Raja Selatan sits under MBSA in Shah Alam, as our Bukit Raja council guide explains; Puncak Alam answers to MPKS. Ask the council's planning and building departments which route your split needs before any wall goes up.

  • MBDK (Klang): its alteration plan checklist, in force since 1 April 2024, is submitted by a registered architect or engineer and asks for the building owner's name and IC, an official title search as proof of ownership, the CF or Form F, a CIDB-registered contractor and, where relevant, Bomba's approval letter and plan. A tenant cannot file it alone; the owner has to be on it.
  • MBSA (Bukit Raja Selatan): its licence checklist, amended on 29 August 2025, says terrace, semi-D and detached factories need a temporary building permit for partition walls, awnings, breaking a party wall or cabins, and an amendment plan through the one stop centre for added partitions, sheds or extra space.

Partition walls, fire compartments and Bomba

The wall between two occupiers is a fire question as much as a building one. Under by-law 138(c) of the Selangor Uniform Building By-Laws 1986, any wall separating part of a building from another part used mainly for a purpose in a different purpose group must be built as a compartment wall. The Fifth Schedule puts factories (premises defined as factories under the Factories and Machinery Act 1967) in Purpose Group VI, places for storing goods and materials in Group VIII and offices in Group IV.

In practice, if one occupier manufactures and the other only stores goods, the wall between them falls under that rule. Its construction and fire rating are for the architect or engineer to specify and the council to approve, not something to put up in board over a weekend. Partitions also change exits, travel distances and sprinkler coverage, so the plan should be drawn for the split you actually intend.

If the building is a designated premises holding a fire certificate, section 32 of the Fire Services Act 1988 requires the occupier to give Bomba notice before beginning a material change; starting without notice is an offence. Bomba can then set the steps needed and amend the certificate or issue a new one. Section 33 makes the owner guilty of an offence if a designated premises has no certificate in force. Our Bomba guide for Klang factories and warehouses explains which buildings are designated.

Every occupier needs its own licence

A sub-tenant cannot trade under the head tenant's licence. MBDK's business and advertisement licence form, still printed under the old Majlis Perbandaran Klang name, has a section for the building owner's permission where the premises is rented: the owner's name, IC number and signature, stating that the owner permits use of the building. Its checklist asks for a floor plan with the area in square metres, the CF, the stamped tenancy agreement, photos of the premises and of the premises beside, above and below it, and an official land search where relevant. An informal sublet tends to surface here, because the sub-tenant needs the owner's signature for its own licence.

For industrial activity, MBDK's temporary industrial licence checklist, in force since 24 September 2024, lists the agencies whose confirmation it needs: Bomba's Klang zone, DOSH, the Department of Environment, the police, customs, APAD, the Klang land office and MBDK's own environmental services, building and town planning departments; complete documents are processed within 30 days. In Bukit Raja Selatan, MBSA asks for a tenancy agreement stamped by LHDN; work out the duty on a sub-tenancy with the tenancy stamp duty calculator (FactoryHub).

Councils act on unlicensed occupiers. In November 2025 MBDK ordered a burger patty factory in Kampung Jawa to close and fined it RM1,000 under its Trade, Business and Industry Licensing By-laws 2007, and sealed an unlicensed forklift repair workshop in Pandamaran, The Star reported. In June 2026 MPKS closed two unlicensed recycling premises in Jeram; Air Selangor cut off and seized the water meters and TNB issued a disconnection notice at the council's request (Kosmo). The trade matters too: a copper recycling operator caught in a Department of Environment sting in Kapar in February 2025 was jailed for a day and fined RM150,000 in January 2026 (FMT). Before you accept a sub-tenant, ask what it will actually do there and check that it fits the industry class of the land and building; our guide to the MBDK licence for factories and warehouses covers the application.

Electricity and water: one meter or two

TNB contracts with one registered user per premises at any one time, landlord or tenant, according to its landlord and tenant booklet. If a rented premises is used for activities that breach the Electricity Supply Act, the registered user is responsible, owner or tenant, and a landlord who stays the registered user answers for arrears left by a tenant who was not.

Passing power on to a second company has a legal edge. Section 9 of the Electricity Supply Act 1990 says no one other than a supply authority may supply electricity to or for the use of another person except under a licence, and section 37(5) sets a fine of up to RM100,000 plus up to RM1,000 for every day the offence continues. TNB's Electricity Supply Application Handbook gives owners of multi-tenanted premises two routes: a bulk supply, which needs a public distribution licence from the Energy Commission, or individual supplies to the landlord and each tenant, with connection schemes and meter locations built to TNB's requirements.

Splitting a unit also splits its capacity. One incoming supply now has to carry two operations, so add up both occupiers' loads with the factory power calculator (FactoryHub) before you agree who gets what. For water, the June 2026 Jeram case shows that meters are among the first things removed when a council acts against an unlicensed occupier.

Insurance, and what to agree before anyone moves in

Insurance follows the occupation. Lulu Loke's guide to fire insurance for shops and factories notes that the landlord usually insures the building while a tenant insures its own machinery, stock and renovation, including partitions and wiring. An owner should tell the insurer that the premises is let and what trade the tenant runs, and tell it again when a new tenant moves in: under standard fire policy conditions, a change of trade or occupation that raises the fire risk must be endorsed on the policy, or cover for that property stops. Hiding flammable materials can lead to a rejected claim.

Agree these points in writing before the sub-tenant or second tenant moves in:

  • The landlord's written consent naming the sub-tenant, the area, the use and the term, which should end on or before your own tenancy.
  • The bank's written consent if the title is charged.
  • Who applies for planning permission and the partition plan or permit, who pays, and who removes the partition at the end.
  • Fire: the compartment wall specification, exits and sprinklers for the new layout, and notice to Bomba if the premises holds a fire certificate.
  • A separate business licence for each occupier, with the owner's signature where the council asks for it.
  • Separate TNB supplies, or another lawful arrangement, and how the incoming capacity is shared.
  • Insurance endorsements for the new trade, and each occupier's own cover for its goods and fit-out.

When renting a smaller unit is simpler

Every item on that list costs time and fees, and several depend on people outside the deal: the owner, the bank, the council and Bomba. If what you need is half of a big building, compare that path with renting a semi-D or terrace factory sized for one occupier; our guide to detached, semi-D and terrace factories compares the types. Ms Teh can help you find factories and warehouses in Kapar, Meru, Bukit Raja and Puncak Alam sized for your own operation, or ask owners whether subletting or splitting a unit is allowed before you sign.

Questions buyers and tenants ask

Is subletting allowed in Malaysia?

Yes, within limits. The National Land Code lets an owner, lessee or tenant grant a tenancy or sub-tenancy of up to three years over the whole or part of what it holds, including part of a building. A tenant's power is subject to the terms of its own tenancy, any restriction on the title and, if the land is charged, the bank's consent. In practice, read the subletting clause and get the landlord's written consent.

What is a sub-lease, and is it the same as a sub-tenancy?

Not quite. Under the Code a sub-lease runs for more than three years, is granted on Form 15B and registered at the land office; over part of a lot it is capped at 30 years and needs a plan of the part. A sub-tenancy runs for three years or less, is exempt from registration and can be written or even oral, so a written and stamped sub-tenancy agreement is what protects both sides.

Can my landlord refuse consent to sublet?

It depends on the wording. In a registered lease, unless it says otherwise, the Code implies that the lessee needs the lessor's prior written consent to sublet, and that consent must not be unreasonably withheld. A tenancy of three years or less is not registered, so its own clause governs; if the landlord says no, have a lawyer read what your agreement actually says.

Can I install a sub-meter (submeter) and charge my sub-tenant for TNB electricity?

Be careful. Section 9 of the Electricity Supply Act 1990 bars anyone other than a supply authority from supplying electricity to another person without a licence, with a fine of up to RM100,000. TNB's handbook gives multi-tenanted premises two routes: a bulk supply under a public distribution licence from the Energy Commission, or a separate TNB supply for each tenant. Ask TNB which route your unit can take before you sign.

Do I need a permit to put up a partition wall in a factory in Bukit Raja Selatan or Klang?

In MBSA's area, which covers Bukit Raja Selatan, the licence checklist says terrace, semi-D and detached factories need a temporary building permit for partition walls, or an amendment plan through the one stop centre for added partitions. In MBDK's area, alteration plans go in through an architect or engineer in the owner's name. If the two sides have different uses, the Selangor building by-laws require a compartment wall.

Does my sub-tenant need its own business licence?

Yes. MBDK's application form asks for the building owner's permission where the premises is rented, and MBSA asks for a stamped tenancy agreement, a floor plan in square metres and the CF. An occupier without a licence risks closure and a fine, as MBDK's November 2025 actions in Kampung Jawa and Pandamaran showed.

Units in these places

Tell Ms Teh what you need

Send the size, power, ceiling height, budget and move-in date you need on WhatsApp, or call her directly.

WhatsApp Ms TehCall